Home

About Us

Product Info

Installation

Photo Gallery

Awards

Contact

 

INSTALLATION: EASY TO USE*

Step 1


------------------------------------------
While the trusses are still stacked on ground, preset two 16d sinker nails, 141/4" apart on each truss in the stack. The nails should be driven in 2 1/2" and will serve as hooks to hold the Ridge Runner in place.

Step 2


------------------------------------------
Line-up the nails with the keyholes on the Ridge Runner and hook the Ridge Runner onto the first truss.

Step 3


------------------------------------------
Hoist the first truss up to the wall top plate and secure the first truss (A) to the bearing wall. Laterally restrain and ground brace the truss per BCSI-B2. Detach the crane hoisting device.

Step 4


------------------------------------------
From a ladder, step onto the Ridge Runner putting your right foot on the right foot peg and your left foot on the left foot peg and then kneeling onto the foam-padded Ridge Runner.

Step 5


------------------------------------------
Anchor the second Ridge Runner to the next truss to be set and hoist the truss into place. Secure second truss (B) to bearing wall and laterally restrain and brace truss per BCSI-B2. Detach crane hoisting device.

Step 6


------------------------------------------
Now that the second truss (B) and Ridge Runner are in place, carefully move from the occupied Ridge Runner on truss A to the unoccupied Ridge Runner on truss B.

Step 7


------------------------------------------
Hoist next truss (C) to top plate and secure truss to bearing wall and laterally restrain and brace truss per BCSI-B2. Detach crane hoisting device. Unhook and move Ridge Runner from truss A up and over truss B, where you are currently kneeling, and anchor Ridge Runner onto truss C. Carefully move from the occupied Ridge Runner on truss B to the unoccupied Ridge Runner on truss C.

Step 8


------------------------------------------
With both Ridge Runners in place, continue to set all remaining trusses by moving unoccupied Ridge Runner from truss A and anchoring to truss C each time a new truss is lifted and secured to the bearing wall as previously described.

*These directions have been simplified for marketing purposes.
You must read and fully understand all the instructions in the
Jobsite Owner's Manual before using this device.
Failure to read the Manual may result in death or serious injury.

 
 
HOME ABOUT US PRODUCT INFO INSTALLATION PHOTO GALLERY AWARDS CONTACT US